Does your kitchen lack storage? Are the appliances no longer working? For many homeowners, these frustrations are quite familiar. It’s not surprising considering that about 10 million homes in the US are 20 to 30 years old. If your kitchen shows signs of wear like dingy floors and cabinets falling off their hinges, this might mean it’s time for a kitchen remodel.
Kitchen remodelling is a major project that needs careful planning. Tackling the steps in the right order ensures the contractor does the job in a fast and efficient manner. Not only will it save you time and money, it also frees you from unnecessary headaches and even lets you enjoy your updated kitchen sooner.
So where should you start? Start by identifying your needs. Think of the pain points in your kitchen and how to resolve them. Next, establish a realistic budget. Most kitchen upgrades cost around $30,000. Finally, enlist an experienced and reliable team to handle the work.
If you’re wondering, “When remodeling a kitchen, what comes first?” Here’s a detailed look at the steps towards a new and improved kitchen.
Doing a Demolition
The first thing contractors do is tear down the old kitchen. This entails removing the appliances, furniture, cabinets, and fixtures. Some kitchen remodeling projects also involve taking down walls or portions of it to open up the space.
Completing a Rough-In
Once the space is clear, the renovation team will then lay in the electrical, mechanical, and plumbing lines. For instance, they will add framing around a center island or relocate plumbing fixtures moved to another area. Rough-in work is critical and time-consuming which requires professional expertise to get it right.
Rebuilding Walls
After the rough-in phase, the construction team will start rebuilding the walls. They’ll put up the insulation and drywalls. Doors and windows are also installed during this phase. At this point, you’ll start to see your kitchen take shape.
Installing Floors
Once the walls are up, you have the choice to have the new flooring installed or wait until all the cabinets and counters are done. Your options include vinyl, tiles, or composite wood. Whatever your preference, the flooring will surely enhance the overall look and durability of your kitchen.
Adding Cabinets and Counters
The next step in your kitchen remodelling process is the installation of cabinets and counters. Cabinet installation may take 3-5 days, while countertops may require a longer lead time. Once measured, cut, and installed, the cabinets and countertops bring functionality and style to your kitchen. Plumbing features for the sink are also added during this phase.
Putting in Appliances
Things are getting exciting at this point as it’s time to bring in the kitchen appliances. Stoves, refrigerators, microwaves, and any special items, like a water filtration system are carefully installed. Experts handling this task must ensure that all appliances are correctly mounted and connected to the utility lines.
Connecting Electrical and Plumbing Fixtures
The final step involves connecting your electrical and plumbing fixtures. Your team will test if all fixtures such as faucets and drains are working seamlessly. If everything seems smooth, then your kitchen is now ready for action. Your kitchen remodel is now complete!
Faithful to Your Vision
At Elegant Home Builders, we understand that remodeling your kitchen is more than just an upgrade – it’s about creating a space where memories are made. As one of the best full-service construction firms in Missouri, we take pride in our craftsmanship and attention to detail in every project.
Whether it’s a kitchen remodel, structural repairs, or a custom renovation, we got you covered. Give us a call today at (816) 433-8939 for a free estimate. You can also message us and ask for a free estimate.